Con Edison Gas Load Letter Sample

The world of utilities can seem complicated, especially when dealing with things like gas service for a new building or a renovation project. One document that often comes up in New York City is the “Con Edison Gas Load Letter.” This essay will break down what a Con Edison Gas Load Letter Sample is all about, why it’s important, and provide some helpful examples. Think of this guide as your friendly introduction to understanding this essential piece of paperwork.

What is a Con Edison Gas Load Letter?

A Con Edison Gas Load Letter is a document that outlines the estimated gas usage for a specific building or project. Its primary purpose is to inform Con Edison (the utility company) about the expected gas demand, ensuring they can adequately supply the building’s needs. It is usually prepared by a licensed professional engineer (PE) or registered architect (RA). Think of it as a heads-up to Con Edison so they can plan their gas infrastructure accordingly. This letter is crucial for new construction, significant renovations, or any project that impacts a building’s gas consumption. Submitting a gas load letter allows Con Edison to review and approve the gas service capacity for your project.

This letter isn’t just a formality; it plays a vital role in the construction and permitting process. Without an approved gas load letter, your project could face delays or even be rejected. The letter provides Con Edison with the information they need to assess the impact of your project on their gas distribution system. The gas load letter must include all appliances that are being used for gas, for example:

  • Heating systems (furnaces, boilers)
  • Water heaters
  • Cooking appliances (ovens, stoves)
  • Clothes dryers
  • Other gas-powered equipment

The information submitted within the letter must be accurate, based on engineering calculations, and aligned with the project’s design specifications. Con Edison uses this information to determine if existing gas infrastructure can support the new load or if upgrades are required. Failure to provide an accurate Gas Load Letter can result in serious delays or fines. These are things that are checked:

  1. Completeness of the application.
  2. Accuracy of the load calculations.
  3. Compliance with Con Edison’s regulations.

Con Edison Gas Load Letter for New Construction

Subject: Gas Load Request for New Building at 123 Main Street

Dear Con Edison Review Team,

This letter serves as a formal request for gas service and load approval for a new residential building located at 123 Main Street, Anytown, NY 10001. The building consists of 20 apartments, each with gas heating, cooking, and hot water.

Detailed Gas Load Calculation Summary:

Appliance Quantity BTU/hr per Unit Total BTU/hr
Furnace 20 80,000 1,600,000
Water Heater 20 40,000 800,000
Gas Range 20 30,000 600,000
Total 3,000,000

Based on the above calculations, the estimated total gas load for the building is 3,000,000 BTU/hr. We have attached detailed load calculations, equipment specifications, and building plans for your review.

We kindly request that you review our application and provide us with a gas service commitment letter. Please contact me at (555) 123-4567 or email me at engineer@email.com if you require any additional information.

Sincerely,

[Your Name]

[Your Title]

[Engineering Firm]

Con Edison Gas Load Letter for a Renovation Project

Subject: Gas Load Request for Renovation at 456 Oak Avenue

Dear Con Edison Review Team,

This letter serves as a formal request for gas load approval for a renovation project at 456 Oak Avenue, Anytown, NY 10001. The renovation involves replacing the existing boiler with a high-efficiency model and adding a gas fireplace.

Existing Gas Load: 500,000 BTU/hr

New Gas Load:

  • New Boiler: 600,000 BTU/hr
  • Gas Fireplace: 40,000 BTU/hr

Total Proposed Gas Load: 640,000 BTU/hr

The existing gas service should be sufficient to handle the increased load; however, we are submitting this request to ensure compliance and obtain your approval. We have attached detailed equipment specifications and updated building plans for your review.

Please review our application and confirm that the existing gas service is adequate. Contact me at (555) 987-6543 or architect@email.com if you have questions.

Sincerely,

[Your Name]

[Your Title]

[Architectural Firm]

Con Edison Gas Load Letter for Increased Capacity

Subject: Request for Increased Gas Capacity at 789 Pine Lane

Dear Con Edison Review Team,

This letter is a formal request for an increase in gas service capacity at 789 Pine Lane, Anytown, NY 10001. We are expanding the commercial kitchen, which requires additional gas-powered cooking equipment.

Current Approved Gas Load: 800,000 BTU/hr

Proposed Additional Gas Load:

  1. Commercial Oven: 100,000 BTU/hr
  2. Additional Burners: 50,000 BTU/hr

Total Proposed Gas Load: 950,000 BTU/hr

The increased gas load is essential for the kitchen expansion to meet the demands of our growing business. We have attached detailed equipment specifications and kitchen layout plans for your review.

We kindly request that you assess the feasibility of increasing the gas service capacity to 950,000 BTU/hr. Please advise on any necessary upgrades or modifications to the existing infrastructure. You can reach me at (555) 456-7890 or manager@email.com.

Sincerely,

[Your Name]

[Your Title]

[Restaurant Manager]

Con Edison Gas Load Letter for Change of Use

Subject: Gas Load Request for Change of Use at 101 Elm Street

Dear Con Edison Review Team,

This letter serves as a formal request for gas load approval due to a change of use at 101 Elm Street, Anytown, NY 10001. The building is being converted from a retail space to a bakery, which requires significantly higher gas usage.

Previous Gas Load (Retail): 100,000 BTU/hr

Estimated Gas Load (Bakery):

  • Ovens: 500,000 BTU/hr
  • Proofers: 50,000 BTU/hr
  • Water Heater: 40,000 BTU/hr

Total Proposed Gas Load: 590,000 BTU/hr

The change of use necessitates a substantial increase in gas service capacity. We have included detailed equipment specifications and bakery layout plans for your review.

We kindly request that you evaluate the proposed gas load and inform us of any required upgrades to the gas service. Contact me at (555) 234-5678 or owner@email.com for any queries.

Sincerely,

[Your Name]

[Your Title]

[Property Owner]

Con Edison Gas Load Letter for Temporary Service

Subject: Request for Temporary Gas Service at Construction Site - 222 Maple Avenue

Dear Con Edison Review Team,

This letter serves as a formal request for temporary gas service at the construction site located at 222 Maple Avenue, Anytown, NY 10001. We require temporary gas for heating during the construction phase.

Gas Load Requirements:

  1. Temporary Heaters: 2 units x 50,000 BTU/hr = 100,000 BTU/hr

Total Gas Load: 100,000 BTU/hr

The temporary gas service will be required for approximately six months, from November 1, 2024, to April 30, 2025. We have attached a site plan showing the location of the temporary heaters.

We kindly request that you provide temporary gas service as soon as possible. Please advise on the connection requirements and any associated fees. Please contact me at (555) 876-5432 or supervisor@email.com.

Sincerely,

[Your Name]

[Your Title]

[Construction Supervisor]

Con Edison Gas Load Letter for Demolition

Subject: Notification of Gas Service Termination for Demolition at 333 Cherry Lane

Dear Con Edison Review Team,

This letter serves as a formal notification that we require termination of gas service for demolition purposes at 333 Cherry Lane, Anytown, NY 10001. The building is scheduled for demolition on October 26, 2024.

Current Gas Load: 200,000 BTU/hr (Previously for heating and hot water)

We kindly request that you disconnect the gas service to the building before the demolition date. Please provide instructions on any necessary steps we need to take to ensure a safe and complete disconnection.

Please confirm the date and time of the gas service termination. Contact me at (555) 345-6789 or contractor@email.com for any scheduling arrangements.

Sincerely,

[Your Name]

[Your Title]

[Demolition Contractor]

In conclusion, understanding the Con Edison Gas Load Letter Sample is crucial for navigating construction, renovation, and other projects involving gas service in New York City. It is a formal way to communicate a project’s gas needs to Con Edison. Always consult with licensed professionals to ensure accuracy and compliance with regulations.